What matters in grid integration
With every new PV plant, grid operators’ requirements increase. Active and reactive power must be controllable, and the plant must respond to setpoints from the control room.
Grid connection requires unit certificates for the inverters and, depending on the size of the plant, a plant certificate.
Challenges
How REFU delivers grid integration
Every REFUsol inverter controls its own active and reactive power. REFUlink combines up to 60 inverters and connects them to the park controller, control room or grid operator.